
220 kV feeder at
220 kV Nha Trang substation.
The project has a total i💜nvestment of
162.8 VND which was invested by the National Power Transmission Corporation
with ꩵthe scale of: upgrade- foundations, columns, replacing accessories,
porcelain insulators, existing conductors ACSR 240/39 by ACSR/Mz 400/51 to
operate the 220 kV voltage level (circuit 2) with a total length of 128.8 km; to
construct one 220 kV feeder at Tuy Hoa 220 kV substation; to expand the substation
and build a new one 220 kV feeder at Nha Trang 220 kV substation.
The line passes through 30 communes in 06
districts, towns a༒nd cities of Phu Yen province and Kh🐭anh Hoa province.
The project was put into operation not only to
enhance the transmission capacity of Tuy Hoa - Nha Trang 220 kV transmission
line, but also to supply power to Khanh Hoa, Phu Yen provinces and improve the
reliability of providing el🌱ectricity, reducing technical losses, improving the
quality of power transmission networks.
With the su💞ccess of this energization, the project
contributes to emulate achievement of Celebrating the 128th birthday of
President Ho Chi Minh and the 10th anniversary of the National Power
Transmission Corporation (1/7/2008 - 1/7/2018).